In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

which is an example of a physical change* metal rusting*silver tarnishing* water boiling* paper burning
The density of ice is 0.92 g/cm3. An ice sculptor orders a one cubic meter block of ice. What is the mass of the block? Hint: 1 m3 = 1,000,000 cm3. Give your an
What does an acid+base make
Douglas wants to draw a circle graph showing the favorite colors of his friends. When he polled his friends asking each their favorite color, 25% of his friends
Force and Motions: Pushes and pulls of all kinds are________.
what is the ordered pair solution for;x + 2y = 53x - y = 1
if log28 = log4 +logx what is the value of x
Force and Motion: Force changes _________.
To make curtains for a living room window for a customer, you will need three pieces of fabric in the following lengths: 3 feet, 3 feet, and 5 feet. What is th
I would like to know if 2 kg is greater or less then 1500 g