In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

what time is 9 hours and 30 minutes before. 4:25
Two 1 litre jugs are each filled with a mixture of olive oil and vinegar. The first jug has 3 times as much as oil as vinegar and the second jug has 4 times as
A 4.5 newton object is placed in a tank of water. If the water exerts a force of 4.0 newtons on the object, will the object sink or float?
The dimensions of a brick that weighs 25 N are 0.19 m × 0.07 m × 0.095 m. What pressure does the brick exert on the ground if it is resting on its largest face?
The neolithic revolution is most closely associated with....
Two 1 litre jugs are each filled with a mixture of olive oil and vinegar. The first jug has 3 times as much as oil as vinegar and the second jug has 4 times as
what time is 9 hours and 30 minutes before. 4:25
The length of a pool is 3 feet more than twice its width. If the perimeter of the pool is 72 feet, find the dimensions of the pool by writing and solving a syst
what is the cause and effect for the french citizens armies win their revolution for liberty and equality
solve 2/3 + 1/4x = 1/3