hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

what does como eres tu mean in spanish?
find the amplitude, period, and phase shift of the function defined by: y=3-2cos(3x+pi)
what does como eres tu mean in spanish?
Compute the odds in favor of rolling a sum of 10 in a single roll of two fair dice
which of the following expressions does not equal: the sixth root of 81x^4y^8 a. (3xy^2)^2/3 b. (3x)^2/3y^4/3 c. (3x^2y^4)^1/3 d. cube root of 9x^2y^4
take 2 identical bowls filled with water.shine a spotlight on one and place one away from the spotlight in the same room. which shows higher evaporation and why
which foods earthworms can digest?
what is force ?is it desirable or undesirable?
What was the South’s greatest concern when California applied for statehood?
An ice cube is dropped into boiling water. How will heat flow between the water and the ice cube?