katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

find the range of the function f(x)=2x+7 for the domain -2,3,8
Which of the following are not parts of a message? Select all that apply. noise meanings symbols encoding feedback decoding
why is second ionization energy larger than first ionization energy
Write three sentences about this picture. “Challenge”
A stuntwoman is going to attempt a jump across a canyon that is 77 m wide. The ramp on the far side of the canyon is 25 m lower than the ramp from which she wil
What does the atomic number of an element tell us?
Which religious groups faced increased discrimination in the wake of the twr roost attacks of September 11 2001
help me now boy or girl
What Is A Nebula? A) cloud of asteroids B) group of stars C) cloud of dust and gas in space D) groups of planets orbiting a star
Need Help Ive been stuck on these for days (Click to Enlarge the Picture)