A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

Kevin is an auto mechanic. He spends 2 hours when he replaces the shocks on a car and 2 hours when he replaces the brakes. He works no more than 54 hours a week
What MAD means in math?
The probability of a result of tails when tossing a coin is
Equation for 8 is less than 2 times a
Find the numerical values of the following expressions. 4 a 8 − a if a = − 2
i need help with this question please
3. Find the area of the triangle. A =_ O O 9 in² in2 13 금 1 O 4½ in 3 38 in 23 2 in
A triangle has a base of 4 inches and height of 6 inches. What is the area of the triangle? 10 in2 12 in2 20 in2 24 in2
Which Windows configuration utility allows you to select various startup options?
Carmen is planning rail lines for a new train station. Help her find m<1. Explain how you found that solution. Parallel lines a and b are cut by transversal