matttmoney1221 matttmoney1221
  • 02-06-2016
  • Business
contestada

​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

what are mnemonic devices
why do people create,structure,and change government
Which statement best describes how a catalyst can speed up a chemical reaction?
four examples of how to test a hypothesis
When France fell to the Nazis in 1940, President Roosevelt issued the first-ever ________ draft. A. wartime B. nationwide C. peacetime D. selective
can Fresh fruit be contaminated by the water used to wash it.
what is 4.16 repeating as a fraction
How is the document called the Declaration of Sentiments like the Declaration of Independence? a. Both were designs for a new form of government. b. Both list
Which shows the expression below simplified? 0.00081 ÷ (9 × 10^-4) -0.9 × 10^-1 9 × 10^-2 9 × 10^0 9 × 10^-1
Can you solve this problem for me Y=3x+3b. For b