carl105
carl105 carl105
  • 04-04-2016
  • Mathematics
contestada

what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Respuesta :

kelpel197
kelpel197 kelpel197
  • 04-04-2016
So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.
Answer Link

Otras preguntas

What does the medical term blast mean?
Which title names a musician who is hired on an as-needed basis as part of an orchestra or band being recorded, but is not part of the featured group? A.contrac
write 8/3 as a decimal
The total energy of a 0.050 kg object travelling at 0.70 c is A) 2.10 × 107 J B) 3.06 × 107 J C) 2.46 × 1015 J D) 6.30 × 1015 J E) 8.82 × 1015 J
2. Multiply 3 ∕ 4 × 16 ∕ 9 . A. 4 ∕ 3 B. 64 ∕ 27 C. 3 ∕ 4 D. 27 ∕ 64
convert 3 pi into radians 540° 500° 440° 400°
How can literary critics help provide insight into what audiences in the future might enjoy reading?
Which of the following New England colonies was the least successful as a trade center?
This legislation called for the creation of civil service tests
Factor completely x 3 +2x 2 ­-15x A. x(x-3)(x+5) B. -3x(x+5)(x+1) C. 5x(x+1)(x-3) D. x(x+5)(x+3)